KeithO
Average Member
76 Posts |
Posted - 11/27/2012 : 15:48:30
|
I think this may be the project info
http://www.virginiadot.org/projects/fredericksburg/staffordboro_boulevard_commuter_parking_lot.asp Coming Soon Staffordboro Boulevard Commuter Parking Lot (Route 610/Garrisonville Road) Project Overview The primary purpose of this project is to add 1,000 parking spaces to the existing parking lot facility at Staffordboro Boulevard in Stafford County, and to improve circulation and safety conditions for vehicular and pedestrian users. The proposed project would also add left and right turn lanes on Staffordboro Boulevard and add a roundabout at Juggins Road. Project Details Additional goals of this project include: • Making infrastructure improvements to the surrounding roadway system to avoid traffic congestion created by the increase in vehicular traffic. • Avoiding or minimizing impacts to the existing wetland. • Improving connectivity to and from Staffordboro Boulevard and Juggins Road. Notable features of the design include: • An elliptical five-point roundabout at the northwest entrance connecting Juggins Road, Doc Stone Road and Moncure Lane to the parking lot at Entrance Drive. • A total of four vehicular entrances into the parking lot facility. One at the roundabout, and three at Staffordboro Boulevard. • Access for school buses from Staffordboro Boulevard through the site. • Informal carpooling, or "slugging," pickup and drop off areas will be located in each parking lot. Each slugging area can accommodate as many as 30 people and 4 vehicles. • A bus bay that can accommodate 4 buses. • Maintains access to the municipal water tower. • Provides a pedestrian sidewalk along Staffordboro Boulevard, and pedestrian access to bus bay area. • Utilizes low impact development techniques to meet stormwater management requirements. • Improvements to Staffordboro Boulevard to improve access to the reconfigured parking lot facility Proposed Schedule A design public hearing on this project has been scheduled: Wednesday, Dec. 14, 2011 4-7 p.m. Anne E. Moncure Elementary 75 Moncure Lane Stafford, VA 22556 • The public design hearing and public comment period is scheduled from December 14, 2011-December 26, 2011. • Approval of location and design: February 2012 • Advertise for construction: December 2012 Estimated Project Cost Total Estimated Cost: • $9,679,000 Engineering of Roadway Plans: • $963,160 Right of Way Acquisition, Relocation Assistance and Utility Relocation: • $1,904,672 Construction: • $6,811,168 • Project Brochure and Documents
KeithO |
|
|