Slug-Lines.com Homepage
Forum Home Forum Home > General Slugging Questions and Comments > General Slugging Topics
  New Posts New Posts RSS Feed - Transportation Advisory: 395 Express Lanes Project
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Transportation Advisory: 395 Express Lanes Project

 Post Reply Post Reply Page  <12
Author
Message
admin2 View Drop Down
Admin Group
Admin Group


Joined: 05 Aug 2017
Status: Offline
Points: 141
Post Options Post Options   Thanks (0) Thanks(0)   Quote admin2 Quote  Post ReplyReply Direct Link To This Post Posted: 07 Feb 2019 at 5:39am
Pentagon TMP Newsletter January 2019:

Construction work continues at the “Pork Chop” and along Eads Street. The temporary relocation of Route 610 Stafford and Mine Road slug stations will remain at the Kiss and Ride area on N. Rotary Rd during the Eads Street construction.

TMP Newsletter January 2019
Back to Top
admin2 View Drop Down
Admin Group
Admin Group


Joined: 05 Aug 2017
Status: Offline
Points: 141
Post Options Post Options   Thanks (0) Thanks(0)   Quote admin2 Quote  Post ReplyReply Direct Link To This Post Posted: 03 Mar 2019 at 8:08am
TMP Newsletter February 2019: Since January 22, 2019, the Eads Street traffic pattern has returned to one lane on both sides of Eads Street, inbound and outbound, while construction work continues along the median. The temporary relocation of Route 610 Stafford and Mine Road slug stations will remain at the Kiss and Ride area on N. Rotary Rd during the Eads Street construction.

Click here for newsletter





Edited by admin2 - 09 May 2019 at 5:21am
Back to Top
admin2 View Drop Down
Admin Group
Admin Group


Joined: 05 Aug 2017
Status: Offline
Points: 141
Post Options Post Options   Thanks (0) Thanks(0)   Quote admin2 Quote  Post ReplyReply Direct Link To This Post Posted: 09 May 2019 at 5:19am
TMP Newsletter March 2019:

395 Express Lanes/South Parking Construction Updates - With the warmer and improving Spring weather, construction work is progressing steadily at the “Pork Chop” to support the bus loop construction and along the Eads Street interchange. Please continue to pay close attention to signage to ensure safety around construction activities. Construction in the Pork Chop area is anticipated to finish by end of May, subject to weather conditions and unplanned events. More information about the final traffic pattern will be provided in the next two months. Follow us on Facebook at WHSTransportation and on Twitter @WHS_Transport: #395ExpressInfo for details.

TMP Newsletter March 2019




Edited by admin2 - 09 May 2019 at 5:23am
Back to Top
 Post Reply Post Reply Page  <12
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.10
Copyright ©2001-2017 Web Wiz Ltd.

This page was generated in 0.078 seconds.