Print Page | Close Window

Rt. 630 / Courthouse Road

Printed From: Slug-Lines.com
Category: General Slugging Questions and Comments
Forum Name: Morning Slug Lines
Forum Description: Enter comments for all slug lines going into the city.
URL: http://www.slug-lines.com/forum/forum_posts.asp?TID=6478
Printed Date: 25 Apr 2024 at 9:39am
Software Version: Web Wiz Forums 11.10 - http://www.webwizforums.com


Topic: Rt. 630 / Courthouse Road
Posted By: clamudge
Subject: Rt. 630 / Courthouse Road
Date Posted: 30 Oct 2017 at 10:18am
Is there any slugging from 630 lot currently ?  I am moving to Embrey Mill and walk to commuter locations.  I need to assess options.  I hear future lots coming and assume more slug action but lots are rumored to be going on other side of 95.  Does anyone know for sure ?
 
 



Replies:
Posted By: KeithO
Date Posted: 31 Oct 2017 at 9:33am
I think the 630/Courthouse Rd lot is pretty much Van Pools. I don't believe any slugging occurs from there. 


Posted By: gatewayslug
Date Posted: 31 Oct 2017 at 11:20am
From VDOT:  http://www.virginiadot.org/projects/fredericksburg/interstate_95-route_630_courthouse_road_interchange_relocation_and_route_630_widening.asp" rel="nofollow - http://www.virginiadot.org/projects/fredericksburg/interstate_95-route_630_courthouse_road_interchange_relocation_and_route_630_widening.asp

Maybe with the extension of the HOT lanes slugging might get restarted at the new 630 lots.

Courthouse Road Park and Ride Lot

This project will relocate and expand the VDOT Park and Ride lot on Courthouse Road in Stafford County.

When construction is complete in 2020, two new Park and Ride lots will open along the relocated Courthouse Road east of I-95. The lots will have a total of 1,100 parking spaces.

A lot north of Courthouse Road will have approximately 850 parking spaces, and will include a dedicated carpool / vanpool pickup and dropoff area to assist with High Occupancy Vehicle (HOV) use.

This lot will also have a dedicated bus dropoff and pickup area. A smaller lot south of Courthouse Road will have an additional 250 parking spaces.

Current lot users will see no change until summer 2018. The existing Park and Ride lot will remain open until that time.

In summer 2018, the existing lot will be closed, and users will be shifted to a temporary lot east of I-95.

The existing 545 parking spaces will be available during construction.

VDOT asks that carpools, vanpools and transit riders continue ridesharing from this I-95 interchange during construction.



Posted By: $Lord1030
Date Posted: 01 Nov 2017 at 1:45pm
When available, I am interested in slugging from 630 to Fort Belvoir


Posted By: eao
Date Posted: 06 Dec 2017 at 12:39pm
You might want to start building interest in slugging from 630 now. As far as I could tell when I was passing the lot in the evening there isn't room for anything other than the vanpools now but get enough suppport for viable lines when it opens in 2020



Print Page | Close Window

Forum Software by Web Wiz Forums® version 11.10 - http://www.webwizforums.com
Copyright ©2001-2017 Web Wiz Ltd. - https://www.webwiz.net