parking spots closing at RT 610 lot Stafford

Printed From: Slug-Lines.com
Category: General Slugging Questions and Comments
Forum Name: General Slugging Topics
Forum Description: This is the area for all general slugging comments. To add a comment simply create a new topic or see FAQ for detailed information on how to post comments.
URL: http://www.slug-lines.com/forum/forum_posts.asp?TID=5456
Printed Date: 04 Jul 2024 at 9:06pm
Software Version: Web Wiz Forums 11.10 - http://www.webwizforums.com


Topic: parking spots closing at RT 610 lot Stafford
Posted By: tangelo53
Subject: parking spots closing at RT 610 lot Stafford
Date Posted: 27 Nov 2012 at 9:21am
Does anyone know anything about this? How many spots are closed, etc? That lot is so full as it is, I am wondering how this is going to affect our commute. the sign said they will be closing the parking spots from 11/28 through January! yikes



Replies:
Posted By: mpatoka
Date Posted: 27 Nov 2012 at 11:33am
Is this at the Mine Road or McDonald's lot? I didn't see any sign this morning at the McDonald's lot but then it was kinda of rainy and I may have missed it standing in line.


Posted By: KeithO
Date Posted: 27 Nov 2012 at 3:48pm
I think this may be the project info

http://www.virginiadot.org/projects/fredericksburg/staffordboro_boulevard_commuter_parking_lot.asp
Coming Soon
Staffordboro Boulevard Commuter Parking Lot
(Route 610/Garrisonville Road)
Project Overview
The primary purpose of this project is to add 1,000 parking spaces to the existing parking lot facility at Staffordboro Boulevard in Stafford County, and to improve circulation and safety conditions for vehicular and pedestrian users.
The proposed project would also add left and right turn lanes on Staffordboro Boulevard and add a roundabout at Juggins Road.
Project Details
Additional goals of this project include:
• Making infrastructure improvements to the surrounding roadway system to avoid traffic congestion created by the increase in vehicular traffic.
• Avoiding or minimizing impacts to the existing wetland.
• Improving connectivity to and from Staffordboro Boulevard and Juggins Road.
Notable features of the design include:
• An elliptical five-point roundabout at the northwest entrance connecting Juggins Road, Doc Stone Road and Moncure Lane to the parking lot at Entrance Drive.
• A total of four vehicular entrances into the parking lot facility. One at the roundabout, and three at Staffordboro Boulevard.
• Access for school buses from Staffordboro Boulevard through the site.
• Informal carpooling, or "slugging," pickup and drop off areas will be located in each parking lot. Each slugging area can accommodate as many as 30 people and 4 vehicles.
• A bus bay that can accommodate 4 buses.
• Maintains access to the municipal water tower.
• Provides a pedestrian sidewalk along Staffordboro Boulevard, and pedestrian access to bus bay area.
• Utilizes low impact development techniques to meet stormwater management requirements.
• Improvements to Staffordboro Boulevard to improve access to the reconfigured parking lot facility
Proposed Schedule
A design public hearing on this project has been scheduled:
Wednesday, Dec. 14, 2011
4-7 p.m.
Anne E. Moncure Elementary
75 Moncure Lane
Stafford, VA 22556
• The public design hearing and public comment period is scheduled from December 14, 2011-December 26, 2011.
• Approval of location and design: February 2012
• Advertise for construction: December 2012
Estimated Project Cost
Total Estimated Cost:
• $9,679,000
Engineering of Roadway Plans:
• $963,160
Right of Way Acquisition, Relocation Assistance and Utility Relocation:
• $1,904,672
Construction:
• $6,811,168
• Project Brochure and Documents