I saw a news piece the other day and wanted to jot down a couple of things. As most of you know, the Transporation Board approved the go ahead on the Beltway HOT lanes. The report said that they approved a 12 lane version that would include 2 HOT lanes in each direction. So the Beltway would be widened from 8 to 12 lanes with the HOT lanes in the middle. The concept I believe was that they could take much of the space out of the existing gap between the inner and outer loop so that they didnt have to bulldoze as many houses.
Anyway, the report said that what remains is an EPA review. If that is approved then they said that construction would start as soon as 6 months with a planned in service year of 2010. They had an interview with the head of the local Sierra Club and he was saying that they really believe that there should not be HOT but a train service down the median. I thought Sierra and all the other enviros had signed on to HOT. Anyway, that was the report I saw. |
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |