Just paving springfield or more? |
Post Reply | Page <123 |
Author | |
DC2RV
Master Slug Joined: 28 Feb 2002 Location: VA Status: Offline Points: 1014 |
Post Options
Thanks(0)
|
Thanks for posting the response.
Question regarding the next to last paragraph - Did Kauffman mean to say "hot" or "hov"? |
|
sluDgE
Master Slug Joined: 27 Oct 2003 Status: Offline Points: 501 |
Post Options
Thanks(0)
|
The F-S Parkway only has ramps to the current HOV lanes that will eventually become the HOT lanes when HOT is implemented.
Please note that there are no entrance ramps from the F-S Parkway onto the I-95 non-HOV (AKA regular)lanes either N'bound or S'bound. |
|
Linda Waller
New Slug Joined: 01 Aug 2006 Location: Virginia Status: Offline Points: 0 |
Post Options
Thanks(0)
|
Reply to DC2RV's question about whether Supervisor Kauffman meant HOV or HOT lanes: HOV.
|
|
Linda Waller
New Slug Joined: 01 Aug 2006 Location: Virginia Status: Offline Points: 0 |
Post Options
Thanks(0)
|
We have just received word that the Circuit City slug site will be reopened either tomorrow morning or Friday morning.
Apparently, the site was closed for routine maintenance—resurfacing—and the contractor was not aware of the slug use. The high heat has slowed the asphalt cure time. If I had to guess, I’d say that with today’s heat and humidity, Friday seems more likely. |
|
Post Reply | Page <123 |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |