Slug-Lines.com Homepage
Forum Home Forum Home > General Slugging Questions and Comments > General Slugging Topics
  New Posts New Posts RSS Feed - BRAC - Springfield
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

BRAC - Springfield

 Post Reply Post Reply Page  12>
Author
Message Reverse Sort Order
gatewayslug View Drop Down
Junior Slug
Junior Slug


Joined: 13 Jan 2003
Status: Offline
Points: 10
Post Options Post Options   Thanks (0) Thanks(0)   Quote gatewayslug Quote  Post ReplyReply Direct Link To This Post Topic: BRAC - Springfield
    Posted: 21 Sep 2011 at 8:05am
Ok, CJ, I read it from the top again this time and see your point. However, the thread did turn to the Mark Center with billybaru's and gawinkworth's posts about the Seminary Rd exit. Since most of my own agency is also moving to the Mark Center that is where my mind was. Sorry I forgot there was more to BRAC here than the Mark Center.
Back to Top
CJ View Drop Down
New Slug
New Slug


Joined: 01 Apr 2006
Location: VA
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote CJ Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2011 at 3:57pm
I meant everyone who is moving into the NGA building has done so. The topic isn't really even about the MARC center.

CJ
Back to Top
gatewayslug View Drop Down
Junior Slug
Junior Slug


Joined: 13 Jan 2003
Status: Offline
Points: 10
Post Options Post Options   Thanks (0) Thanks(0)   Quote gatewayslug Quote  Post ReplyReply Direct Link To This Post Posted: 20 Sep 2011 at 12:10pm
Sorry, CJ, but not everyone who is going to move into the Mark Center has moved in so the traffic could get worse than it is now. Thanks to a certain congressman the planned move-in schedule has been stretched out over several more months. And yes, that is going to cost the taxpayers a few million extra since they won't be vacating leased offices as planned.
Back to Top
gawinkworth View Drop Down
New Slug
New Slug


Joined: 22 Sep 2005
Location: VA
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote gawinkworth Quote  Post ReplyReply Direct Link To This Post Posted: 19 Sep 2011 at 9:52am
Last I heard was sometime in 2012 (pending approval of an environmental impact study), with a completion date in 2015.

Update - found this via Google:

http://www.mwcog.org/clrp/projects/new/descriptions/2011/2011-CLRP-I395-Seminary-HOV-Ramp.pdf

Geoffrey A Winkworth
Senior Analyst/Developer
AT&T Government Solutions, Inc.
571.372.4384
Back to Top
billybaru View Drop Down
New Slug
New Slug


Joined: 03 Dec 2010
Status: Offline
Points: 1
Post Options Post Options   Thanks (0) Thanks(0)   Quote billybaru Quote  Post ReplyReply Direct Link To This Post Posted: 19 Sep 2011 at 9:03am
Has anybody heard when the SEMINARY RD HOV exit work will start ? just curious
Back to Top
CJ View Drop Down
New Slug
New Slug


Joined: 01 Apr 2006
Location: VA
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote CJ Quote  Post ReplyReply Direct Link To This Post Posted: 16 Sep 2011 at 8:21pm
Everyone that is suppose to move into the building has done so. So whatever the traffic looks like now that's the worse it's going to get.

CJ
Back to Top
Jody View Drop Down
New Slug
New Slug


Joined: 01 Aug 2006
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote Jody Quote  Post ReplyReply Direct Link To This Post Posted: 19 Aug 2011 at 11:28am
It is also affecting the FFX County Parkway at the Rolling Road ramp. Traffic backs up in the right lane to access the ramp.
Back to Top
Bodybykids View Drop Down
New Slug
New Slug


Joined: 01 Jul 2010
Location: VA
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote Bodybykids Quote  Post ReplyReply Direct Link To This Post Posted: 19 Aug 2011 at 10:01am
It is affecting 95S in the morning. There is a nice little backup to exit of 95 to get to NGA. That of course creates a little traffic congestion getting over to the left to get around the back-up.
Back to Top
CJ View Drop Down
New Slug
New Slug


Joined: 01 Apr 2006
Location: VA
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote CJ Quote  Post ReplyReply Direct Link To This Post Posted: 18 Aug 2011 at 3:48pm
Over 90% of the folks who work there are already moved in (its NGA not NGIA). There were all kinds of road improvements made for it. The only effect you all should see is that at least probably a couple hundred people who used to slug or pick up slugs will no longer being doing so since they don't have to drive into DC and Maryland.

CJ
Back to Top
Flyby View Drop Down
New Slug
New Slug


Joined: 09 Dec 2006
Location: Virginia
Status: Offline
Points: 0
Post Options Post Options   Thanks (0) Thanks(0)   Quote Flyby Quote  Post ReplyReply Direct Link To This Post Posted: 18 Aug 2011 at 12:06pm
That's great to hear that they're offering flexibility to their work force. Only time will tell what the impact will be on the mess that already is present on Old Keene Mill up to Rolling Rd and Lee Chapel, Backlick up to Pohick and beyond, the Parkway up to who knows where, etc. Say your prayers.

Flyby
Back to Top
 Post Reply Post Reply Page  12>
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.10
Copyright ©2001-2017 Web Wiz Ltd.

This page was generated in 0.141 seconds.